Wuhan Petrochemical Wastewater Treatment Plant Upgrading Project
2023-03-21
分享到:
Project time: 2016 Capacity: 9600m3/d
Main process: aeration biofilter, ozone catalytic oxidation process, denitrification filters
The first application case of advanced oxidation in petrochemical industry, the quality of discharged water is better than the new national standard.
Wuhan Petrochemical Wastewater Treatment Plant on the existing saline wastewater system for renovation, the realization of oily, saline wastewater, “sewage treatment”, the new oily, saline system aeration biofilter as well as post denitrification process, the first time to use ozone-catalyzed oxidation process for the depth of treatment of wastewater, so that the CODcr is further reduced.